Paper Review Records
全部论文审稿周期
28 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
105
天
144
天
An NLP-driven analytical pipeline for exploring Digital Twin research maturity in construction
作者
Elghaish, Faris; Matarneh, Sandra T.; Rahimian, Farzad; Tezel, Algan; Abdelmegid, Mohammed展开收起
作者单位
1. The School of Natural and Built Environment, Queen's University Belfast , Belfast , UK; 2. Department of Civil Engineering, Faculty of Engineering, Al-Ahliyaa Amman University , Amman , Jordan; 3. School of Architecture, Building and Civil Engineering, Loughborough University , Loughborough , UK; 4. Anglia Ruskin University , Cambridge , UK; 5. School of Civil Engineering, University of Leeds , Leeds , UK展开收起
147
天
The application of Fourier series in forecasting construction project completion: a case study
作者
Marpaung, Bangun; Chen, Wei Tong; Huang, Ying-Hua; Lin, Chi-Wen; Chen, Tai-Jung展开收起
作者单位
1. Graduate School of Engineering Science and Technology, National Yunlin University of Science and Technology , Yunlin , Taiwan; 2. Graduate School of Engineering Science and Technology, National Yunlin University of Science and Technology , Yunlin , Taiwan Department of Civil and Construction Engineering, National Yunlin University of Science and Technology , Yunlin , Taiwan; 3. Department of Civil and Construction Engineering, National Yunlin University of Science and Technology , Yunlin , Taiwan; 4. Graduate School of Engineering Science and Technology, National Yunlin University of Science and Technology , Yunlin , Taiwan Department of Safety, Health and Environmental Engineering, National Yunlin University of Science and Technology , Yunlin , Taiwan; 5. Department of Industrial and Systems Engineering, Virginia Polytechnic Institute and State University , Blacksburg , Virginia , USA展开收起
488
天
453
天
237
天
A cost-benefit analysis of mine slope stability with consideration of risk losses
作者
Liu, Pingting; Gutiérrez-Ch, José G.; Jin, Liangxing; Jimenez, Rafael展开收起
作者单位
1. School of Civil Engineering, Central South University , Changsha , China; 2. Departamento de Ingeniería y Morfología del Terreno, Escuela Técnica Superior de Ingenieros de Caminos Canales y Puertos, Universidad Politécnica de Madrid , Madrid , Spain展开收起
FAQ
Engineering Construction and Architectural Management审稿要多久?
截至2026-11-16,CrushSCI 收录了 Engineering Construction and Architectural Management 的 28 篇完整审稿记录。最快一篇从收稿到录用用了 84 天(Achieving multi-project portfolio performance through resource-transfer optimization using an improved MOGPOO,2026-04-03 收稿,2026-06-26 录用),最慢一篇用了 530 天;平均 251.2 天,中位数 223.5 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
