CrushSCI.com
227.4Average days
196Median days
47Fastest days
544Longest days
2512025 publications

Paper Review Records

All Paper Review Records

16 valid samples · Newest publication first
Review days = acceptance date − received date. PDF, DOI, and publisher-page sources are retained.

250 days

Influence of particle morphology on hydraulic conductivity of granular materials: quantification of Kozeny–Carman shape factor

Authors
Jeongwoo Kim; Noeul Kim; Hyunwook ChooShow moreShow less
Affiliations
Department of Civil and Environmental Engineering, Hanyang University, Seoul, South KoreaShow moreShow less
Source PDF DOI Publisher page
398 days

Experiment of longitudinal prestress distribution model based on optical fiber Bragg grating technology

Authors
Jianliang Wang; Qian WeiShow moreShow less
Affiliations
China Railway Construction Investment Shandong Xiaoqinghe Development Co., LTD, Jinan, 250109, China; Institute of Geotechnical and Underground Engineering, Shandong University, Jinan, 250061, ChinaShow moreShow less
Source PDF DOI Publisher page
134 days

Strain evolution, deformation coupling, and crack calculation of mass concrete bent caps during hydration heat with a prestressed double-wall threaded cooling pipe system

Authors
Hao Wu; Jia Liu; Haixiang Zhou; Guokang ZhaoShow moreShow less
Affiliations
General Contracting Company I, Shanghai Road and Bridge (Group) Co., Ltd, Shanghai, 200040, China; College of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing, 211100, ChinaShow moreShow less
Source PDF DOI Publisher page
190 days

Self-rotating intelligent launching construction and stability analysis of long-span steel-concrete composite girder bridges

Authors
Hong Zijie; Li Xiao; Yang Chenchen; Liu Huan; Cao WenquanShow moreShow less
Affiliations
School of Civil Engineering, Henan Polytechnic University, Jiaozuo, Henan, 454003, China; Henan Provincial Engineering Research Center for Ecological Architecture and Environmental Construction, Jiaozuo, Henan, 454003, China; School of Civil Engineering, Henan Polytechnic Technology, Jiaozuo, Henan, 454003, China; CNCEC Construction Engineering Co., Ltd., Suzhou, 215400, China; China Railway 18th Bureau Group Fifth Engineering Co., Ltd., Tianjin, 300451, ChinaShow moreShow less
Source PDF DOI Publisher page
311 days

Seismic performance evolution of precast double-column piers considering bond-slip behavior of energy-dissipating bars

Authors
Yuye Zhang; Hongyu Tu; Hailing Shi; Shaoyu ZhaoShow moreShow less
Affiliations
School of Safety Science and Engineering, Nanjing University of Science and Technology, Nanjing, 210094, China; School of Engineering, Swinburne University of Technology, Hawthorn, VIC 3122, AustraliaShow moreShow less
Source PDF DOI Publisher page
255 days

Research on a dam slope displacement prediction model coupling sparse probabilistic learning with a hybrid deep learning framework

Authors
Ying Li; Qingbo Yi; Jie Ren; Caiyi Zhang; Jinlong Guo; Qisong LingShow moreShow less
Affiliations
POWERCHINA Guiyang Engineering Corporation Limited, Guiyang, 550081, China; State Key Laboratory of Water Engineering Ecology and Environment in Arid Area, Xi’an University of Technology, Xi’an, 710048, ChinaShow moreShow less
Source PDF DOI Publisher page

FAQ

How long does KSCE Journal of Civil Engineering take to review a manuscript?

As of 2026-11-19, CrushSCI has 16 complete review records for KSCE Journal of Civil Engineering. The fastest paper went from submission to acceptance in 47 days (Modeling public parking demand at the small-block level using detailed building-use data: A market-segmentation approach, received 2026-07-10, accepted 2026-08-26); the slowest took 544 days. The average is 227.4 days and the median is 196 days.

Expert Matching · Case Demo

Turn Your Submission Goalsinto a Verifiable Journal Plan

Share your field, deadline, and author profile. CrushSCI uses real review records to suggest a title direction, shortlist journals, and estimate timelines.

We will reply within 30 minutes.

CrushSCI online

Client

I work in environmental engineering and need an SCI paper published within three months. I have no grant funding or prominent co-author. Which journals could I target?

CrushSCI

Yes. We will first screen for feasibility against the 90-day deadline, then identify comparable papers without grant support or prominent co-authors. The final shortlist will prioritize research quality and journal scope.

Suggested title
Machine Learning and Life-Cycle Assessment for Predicting and Optimizing Carbon Emissions in Urban Wastewater Treatment

SampleLatest 5 valid paper samples from 2026

Average review59.6 days

Median65 days

Contact CrushSCI

Contact CrushSCI

Leave your email address to discuss academic polishing, structural refinement, or one-to-one guidance.

We will reply within 30 minutes.

Selected service: Academic Consulting Service

Leave your email address

Or email us directly at leader@crushsci.com

Enter your email address so we can reply. Your details will remain private.