Engineering
Review Cycle Records
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A-Civil Engineering
Paper Review Records
All Paper Review Records
5 valid samples · Newest publication first
Review days = acceptance date − received date. PDF, DOI, and publisher-page sources are retained.
Efficient Bridge Geometric Digital Twinning Using a Parametric Bridge Generator
Huayong Wu; Rongxin Zhao; Weilei Yu; Tianyi Xu; Fang Fang; Yining Zhu; Yuanyuan Zhang; Yutong Zhou; Mingyu Shi; Yasutaka NarazakiShow moreShow less
1. Shanghai Research Institute of Building Sciences Co. Ltd.; 2. Univ. of Tsukuba; 3. Zhejiang Univ.; 4. Stanford Univ.Show moreShow less
Risk Assessment and Control of Deepwater Umbilical Cable–Laying Process Based on a Complex Network
Rongguang Zhang; Hongsheng YanShow moreShow less
1. Tianjin Univ.Show moreShow less
Time-Dependent Reliability Analysis of a Multicomponent System Subject to Multiple Dependent Competing Failure Processes Using Phase-Type Distribution
Junxiang Li; Zhipeng Dong; Moran Xu; Longchao Cao; Xinxin ZhangShow moreShow less
1. Wuhan Textile Univ.; 2. Hubei Polytechnic Univ.Show moreShow less
Integrating Large Language Models with Systemic Methods: A Hybrid Approach for Resilience Modeling of Hydrogen Refueling Stations
Jinduo Xing; Yujie Zhang; Jiaqiang Wang; Hui ZhangShow moreShow less
1. Beijing Univ. of Civil Engineering and Architecture; 2. Beijing Academy of Emergency Management Science and TechnologyShow moreShow less
Structural Reliability of Unreinforced Masonry Shear Walls Subjected to In-Plane Lateral Loading
Lewis J. Gooch; Mark G. Stewart; Mark J. MasiaShow moreShow less
1. James Cook Univ.; 2. Univ. of Technology Sydney; 3. Univ. of NewcastleShow moreShow less
FAQ
How long does ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A-Civil Engineering take to review a manuscript?
As of 2026-11-19, CrushSCI has 5 complete review records for ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A-Civil Engineering. The fastest paper went from submission to acceptance in 84 days (Integrating Large Language Models with Systemic Methods: A Hybrid Approach for Resilience Modeling of Hydrogen Refueling Stations, received 2025-12-30, accepted 2026-03-24); the slowest took 278 days. The average is 149.6 days and the median is 134 days.
Expert Matching · Case Demo
Turn Your Submission Goalsinto a Verifiable Journal Plan
Share your field, deadline, and author profile. CrushSCI uses real review records to suggest a title direction, shortlist journals, and estimate timelines.