Paper Review Records
全部论文审稿周期
6 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
107
天
183
天
A Process-Based Model for Forecasting Wave Runup along the Coast of Georgia
作者
Robert A. Fiegelist; Matthew V. Bilskie; Davina L. Passeri; C. Brock Woodson; Aditya Gupta展开收起
作者单位
1. US Army Corps of Engineers; 2. Univ. of Georgia; 3. US Geological Survey St. Petersburg Coastal and Marine Science Center展开收起
277
天
Experimental Quantification of Tsunami Debris-Damming Loads and Failure Probability for an Elevated Structure Using a Kriging-Assisted Sequential Design of Experiments
作者
Jayasekara R. Jayasekara; Jaril Deschamps; Sabarethinam Kameshwar; Hyoungsu Park展开收起
作者单位
1. Louisiana State Univ.; 2. Univ. of Hawaii at Manoa展开收起
144
天
Horizontal Soil Resistance of Exposed Pipelines in Sand Wave Areas: Experiments and Upper-Bound Analysis
作者
Zheng Yu; Run Liu; Jinfang Hou; Chengfeng Li; Yinze Guan; Yinuo Liu展开收起
作者单位
1. Tianjin Port Engineering Institute Co., Ltd., CCCC First Harbor Engineering Co., Ltd.,; 2. Tianjin Univ.; 3. Tianjin Port Engineering Institute Co., Ltd., CCCC First Harbor Engineering Co., Ltd.展开收起
149
天
A Fully Probabilistic and Response-Driven Approach for the Design of Coastal Storm Risk Management Systems: A Case Study of the Sabine Pass to Galveston Bay Project
作者
Abigail L. Stehno; Jeffrey A. Melby; Shubhra Misra; T. Chris Massey; Norberto C. Nadal-Caraballo展开收起
作者单位
1. US Army Corps of Engineers; 2. Coastal Engineering and Adaption Solutions展开收起
124
天
FAQ
JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING审稿要多久?
截至2026-11-19,CrushSCI 收录了 JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING 的 6 篇完整审稿记录。最快一篇从收稿到录用用了 107 天(A Note on Satellite Altimeter–Derived Wave Height and Wind Speed Measurements in the Gulf of Mexico,2026-03-15 收稿,2026-06-30 录用),最慢一篇用了 277 天;平均 164 天,中位数 146.5 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
