Paper Review Records
全部论文审稿周期
6 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
108
天
Centrifuge model study on deformation behaviour of geocell retaining wall with loose backfill
作者
Razeghi, H. R.; Nazari, A.; Salehzadeh, H.展开收起
作者单位
1. 1 School of Civil Engineering, Iran University of Science and Technology , Tehran, Iran , E-mail: razeghi@iust.ac.ir; 2. 2 School of Civil Engineering, Iran University of Science and Technology , Tehran, Iran , E-mail: nazari_a@civileng.iust.ac.ir; 3. 3 School of Civil Engineering, Iran University of Science and Technology , Tehran, Iran展开收起
46
天
Macro- and meso-scopic analysis of pullout characteristics of 3-D geogrid-sand interface
作者
Wang, D.; Liang, X.; Jin, J.; Yang, G.展开收起
作者单位
1. 1 School of Civil Engineering, Heibei University of Science and Technology , Shijiazhuang, China . E-Mail: w347044192@gmail.com; 2. 2 School of Civil Engineering, Heibei University of Science and Technology , Shijiazhuang, China ; School of Traffic and Transportation, Shijiazhuang Tiedao University, Shijiazhuang, China; Hebei Province Housing Construction Projects Regeneration Technology Innovation Center, Shijiazhuang, China. E-mail: liaxiayon_2001@163.com; 3. 3 School of Civil Engineering, Heibei University of Science and Technology , Shijiazhuang, China ; Hebei Province Housing Construction Projects Regeneration Technology Innovation Center, Shijiazhuang, China; 4. 4 School of Civil Engineering, Shijiazhuang Tiedao University , Shijiazhuang, China . E-mail: gtsyang@163.com展开收起
157
天
Optimum jute geotextile spacing in reinforced sand: shear modulus and damping variation
作者
Peddaiah, S.; Kumar, J.展开收起
作者单位
1. 1 Civil Engineering Department, Indian Institute of Science , Bengaluru, India , E-mail: peddaiahs@iisc.ac.in; 2. 2 Civil Engineering Department, Indian Institute of Science , Bengaluru, India展开收起
222
天
Load-bearing performance of MSE walls with different facing configurations
作者
Xu, P.; Wang, H.; Su, Y.; Li, T.; Yang, G.; Hatami, K.展开收起
作者单位
1. 1 State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures, Shijiazhuang Tiedao University , Shijiazhuang, China , E-mail: bk20090201@my.swjtu.edu.cn; 2. 2 School of Civil Engineering, Shijiazhuang Tiedao University , Shijiazhuang, China , E-mail: 960609448@qq.com; 3. 3 School of Civil Engineering, Shijiazhuang Tiedao University , Shijiazhuang, China , E-mail: 15613870190@163.com; 4. 4 School of Civil Engineering, Shijiazhuang Tiedao University , Shijiazhuang, China , E-mail: bk20110484@my.swjtu.edu.cn; 5. 5 School of Civil Engineering, Shijiazhuang Tiedao University , Shijiazhuang, China , E-mail: gtsyang@163.com; 6. 6 School of Civil Engineering and Environmental Science, University of Oklahoma , Norman , USA展开收起
244
天
Optimization of preloading in MSE walls: numerical and experimental analysis
作者
Ahmadi, H.; Bezuijen, A.; Farzam, M.F.展开收起
作者单位
1. 1 Department of Civil Engineering, Faculty of Engineering, University of Maragheh , Maragheh, Iran; 2. 2 Ghent University , Ghent, Belgium , E-mail: adam.bezuijen@ugent.be; 3. 3 Department of Civil Engineering, Faculty of Engineering, University of Maragheh , Maragheh, Iran ; Faculty of Civil Engineering, Sahand University of Technology, Tabriz, Iran, E-mail: m.farzam@maragheh.ac.ir展开收起
266
天
Study on creep properties of geosynthetics under CBR puncture load
作者
Wu, D.; Yi, Y.; Li, D.; Zhang, Z.; Xu, C.; Luo, C.; Liang, T.; Gong, L.展开收起
作者单位
1. 1 School of Architecture and Transportation Engineering, Guilin University of Electronic Technology , Guilin, Guangxi, China , E-mail: wudi@guet.edu.cn; 2. 2 School of Architecture and Transportation Engineering, Guilin University of Electronic Technology , Guilin, Guangxi, China ; School of Civil Engineering and Architecture, Guangxi University, Nanning, Guangxi, China, E-mail: yiyang112023@163.com; 3. 3 Department of Geotechnical Engineering, Tongji University , Shanghai, China , E-mail: ld@guet.edu.cn; 4. 4 Department of Geotechnical Engineering, Tongji University , Shanghai, China; 5. 5 Department of Geotechnical Engineering, Tongji University , Shanghai, China , E-mail: c_axu@tongji.edu.cn; 6. 6 Department of Geotechnical Engineering, Tongji University , Shanghai, China , E-mail: 2210403@tongji.edu.cn; 7. 7 School of Architecture and Transportation Engineering, Guilin University of Electronic Technology , Guilin, Guangxi, China , E-mail: taimingLiang29@mails.guet.edu.cn; 8. 8 School of Architecture and Transportation Engineering, Guilin University of Electronic Technology , Guilin, Guangxi, China , E-mail: 2585915075@qq.com展开收起
FAQ
GEOSYNTHETICS INTERNATIONAL审稿要多久?
截至2026-11-19,CrushSCI 收录了 GEOSYNTHETICS INTERNATIONAL 的 6 篇完整审稿记录。最快一篇从收稿到录用用了 46 天(Macro- and meso-scopic analysis of pullout characteristics of 3-D geogrid-sand interface,2025-12-18 收稿,2026-02-02 录用),最慢一篇用了 266 天;平均 173.8 天,中位数 189.5 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
