Paper Review Records
全部论文审稿周期
16 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
208
天
A computer-vision workflow for quantifying facade features of Jiarong Tibetan dwellings: an exploratory case study in Molo Village
作者
Hai Xiao; Shaoliang Zhang; Zhonglin Li; Manman Dong; Fengjiao Jiang; Liangzheng Liu; Qianshu Zhao; Mengxi Yu; Xi Yu; Yaoyao Huang展开收起
作者单位
1. Sichuan Agricultural University展开收起
135
天
157
天
64
天
177
天
Integrating parametric design, field-evaluated hygrothermal simulation and life-cycle assessment for early-stage low-carbon envelope decisions: a pilot demonstration on a full-scale salt-brick pavilion in a hot-arid climate
作者
Aref Maksoud; Aseel Hussien; Shouib Ma'bdeh展开收起
作者单位
1. University of Sharjah展开收起
116
天
Toward safer and maintainable affordable housing design: the architectural safety design assessment (ASDA) framework
作者
Nor Syamimi Samsudin; Natasha Khalil; Azizah Md Ajis; Nurin Mansoor; Anthony Lee Tee; Mazlina Zaira Mohammad; Michael Behm展开收起
作者单位
1. Universiti Teknologi MARA; 2. Univervisiti Putra Malaysia; 3. , PAM Centre; 4. Universiti Teknologi MARA Shah Alam; 5. Keene State College展开收起
FAQ
Architectural Engineering and Design Management审稿要多久?
截至2026-11-19,CrushSCI 收录了 Architectural Engineering and Design Management 的 16 篇完整审稿记录。最快一篇从收稿到录用用了 64 天(When one design makes another look better: biophilic option geometry in workplace appraisal,2026-07-29 收稿,2026-10-01 录用),最慢一篇用了 208 天;平均 140.7 天,中位数 150.5 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
