Paper Review Records
全部论文审稿周期
15 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
50
天
Hydraulic performance of Cubipod Homogeneous Low Crested Structures in depth-limited wave breaking conditions
作者
Jorge Molines; Enrique Ripoll; Paula Dasí; Pilar Díaz-Carrasco; Rodolfo Silva; Edgar Mendoza; Pedro Lomónaco; Jose A. González-Escrivá; Mireille Escudero; Josep R. Medina展开收起
作者单位
Universitat Politècnica de València, Laboratory of Ports and Coasts, Valencia, Spain; University of Seville, Dept. of Construction Engineering and Engineering Projects, Seville, Spain; University of Granada, Andalusian Inter-University Institute for Earth System Research, Granada, Spain; Universidad Nacional Autónoma de México, Instituto de Ingeniería, Ciudad de México, Mexico; Oregon State University, Corvallis, United States展开收起
110
天
141
天
River-mouth hydrodynamics and flood hazard potential: Interactions between river discharge, tidal forcing, and morphodynamic bar development
作者
Antonio Ruiz-Reina; Carmen Zarzuelo; Alejandro López-Ruiz展开收起
作者单位
Universidad de Sevilla, Departamento de Ingenieria Aeroespacial y Mecanica de Fluidos, Camino de los Descubrimientos s/n, Seville, 41092, Spain展开收起
103
天
Representation strategies of nearshore short waves for predicting infragravity harbor oscillations: A systematic comparison
作者
Zhenjun Zheng; Zhi Feng; Xiaozhou Ma; Guohai Dong展开收起
作者单位
School of Ocean Science and Engineering, Hainan University, Haikou, 570228, China; State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian, 116024, China展开收起
80
天
149
天
Hydrodynamic transition of tsunami waves to overland flows: Large-scale experiments and engineering implications
作者
David J. McGovern; Tiziana Rossetto; Ian Chandler展开收起
作者单位
School of Engineering and Design, London South Bank University, London, SE1 6LN, UK; Hydraulic Engineering Department, Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, The Netherlands; HR Wallingford, OX10 8BA, UK展开收起
FAQ
COASTAL ENGINEERING审稿要多久?
截至2026-11-19,CrushSCI 收录了 COASTAL ENGINEERING 的 15 篇完整审稿记录。最快一篇从收稿到录用用了 39 天(Stage-resolved evolution and size-dependent vertical transport of bubble clouds beneath plunging breaking waves,2026-07-16 收稿,2026-08-24 录用),最慢一篇用了 228 天;平均 117.1 天,中位数 110 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
