Paper Review Records
全部论文审稿周期
1 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
142
天
An ahead-of-face geological detection method for drill-and-blast tunnels using signals from consecutive blasting cycles
作者
Xingang Zhang; Yonglin Li; Liping Li; Dong Hu; Songnan Ru; Shuai Cheng; Qingliang Sun展开收起
作者单位
School of Qilu Transportation, Shandong University, Jinan 250002, China; State Grid Xin Yuan Hubei Tongshan Pumped Storage Power Co. Ltd., Wuhan 430000, China; State Key Laboratory of Intelligent Manufacturing of Advanced Construction Machinery, Shandong University, Jinan 250002, China; State Grid Xin Yuan Group Co., Ltd., Beijing 100052, China展开收起
FAQ
Underground Space审稿要多久?
截至2026-11-19,CrushSCI 只收录了 Underground Space 的 1 篇完整审稿记录:An ahead-of-face geological detection method for drill-and-blast tunnels using signals from consecutive blasting cycles,2026-04-21 收稿,2026-09-10 录用,审稿 142 天。只有一篇样本,结果仅供参考。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
