Paper Review Records
全部论文审稿周期
25 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
225
天
Can Pre‐Computed Flood Libraries Efficiently Support Surface Water Flood Forecasting? A Case Study of Marseille, South‐Eastern France
作者
Akshay Kowlesser; Eric Gaume; Pierre Nicolle; Nabil Hocini; Frederic Pons; Julie Demargne; Pierre‐André Garambois; Pierre Javelle; Olivier Payrastre展开收起
作者单位
1. GERS‐LEE, Univ. Gustave Eiffel, IFSTTAR Bouguenais France; 2. Cerema Aix‐en‐Provence France; 3. HYDRIS Hydrologie St Bauzille de Montmel France; 4. RECOVER, INRAE, Université d'Aix‐Marseille Aix En Provence France展开收起
136
天
440
天
Temporal Trends in Extreme Precipitation Events in Eight Flood‐Prone US Inland Cities (1981–2023)
作者
Yen‐Yi Wu; Austin Madson展开收起
作者单位
1. Wyoming Geographic Information Science Center (WyGISC) University of Wyoming Laramie Wyoming USA; 2. Yale Center for Geospatial Solutions (YCGS) Yale University New Haven Connecticut USA展开收起
199
天
Multi‐Scale Hydrodynamic Simulation Framework for Flood Risk Assessment of Urban Metro Stations
作者
Zhi Li; Hanqi Li; Eduardo Martínez‐Gomariz; Beniamino Russo; Dianlei Feng; Dongming Zhang展开收起
作者单位
1. College of Civil Engineering Tongji University Shanghai China; 2. Shanghai Key Laboratory of Urban Regeneration and Spatial Optimization Technology Shanghai China; 3. Flumen Research Institute Universitat Politècnica de Catalunya Barcelona Spain展开收起
321
天
When People Meet Floods: Time‐Varying Population Exposure to Urban Pluvial Flooding in Rome, Italy
作者
Edna Jessica Wilches Kochinski; Sabrina Lanciotti; Benedetta Moccia; Elena Ridolfi; Fabio Russo; Francesco Napolitano展开收起
作者单位
1. Hazen & Sawyer Hollywood Florida USA; 2. Dipartimento di Ingegneria Civile, Edile e Ambientale (DICEA) Università Degli Studi di Roma La Sapienza Rome Italy; 3. Sapienza School for Advanced Studies, Sapienza University of Rome Rome Italy展开收起
251
天
Bridging Geomythology and Geospatial Analysis for Flood Risk Assessment in Tamil Nadu
作者
Shrishti Kushwah; Keval Jodhani; Nigam Dave; Dhruvesh Patel展开收起
作者单位
1. Department of Languages Literature and Aesthetics, School of Liberal Studies, Pandit Deendayal Energy University Gandhinagar India; 2. Department of Civil Engineering Institute of Technology, Nirma University Ahmedabad Gujarat India; 3. Department of Civil Engineering School of Technology, Pandit Deendayal Energy University Gandhinagar India展开收起
FAQ
Journal of Flood Risk Management审稿要多久?
截至2026-11-17,CrushSCI 收录了 Journal of Flood Risk Management 的 25 篇完整审稿记录。最快一篇从收稿到录用用了 79 天(Towards Enhancing Nature‐Based Solutions in Flood Risk Management in Australia: A Review of Their Barriers, Enablers, and Future Perspectives,2026-04-14 收稿,2026-07-02 录用),最慢一篇用了 448 天;平均 209.2 天,中位数 189 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
