Paper Review Records
全部论文审稿周期
20 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
68
天
Assessment of Wind‐Induced Responses and Fatigue Performance of Spar‐Type Floating Offshore Wind Turbines Considering Uncertainty in Field‐Measured Wind Speed Profiles
作者
Siyu Liang; Lingjie Li; Yongbo Peng; Tong Chang; Rui Hua Dong; Ying Lei展开收起
作者单位
1. Xiamen University; 2. Tongji University; 3. Fuzhou University展开收起
188
天
Multiview Consistent 3D Reconstruction of Concrete Defects via Automated Segmentation‐Guided 2D Gaussian Splatting
作者
Da-You Duan; Zuocai Wang; Liang He展开收起
作者单位
1. Hefei University; 2. Anhui Jianzhu University; 3. Anhui Province Architectural Design and Research Institute Co., Ltd. , Hefei 230093 , Anhui, China展开收起
43
天
A Self‐Attention‐Enhanced TCN‐BiGRU Framework for Missing Temperature Data Recovery in Construction‐Stage Bridge Monitoring
作者
Zujun Zhang; Jiangyan Wu; Guoliang Zeng; Wenping Peng; Zhongchu Tian; Yang Deng; Benkun Tan展开收起
作者单位
1. Hunan University of Arts and Science; 2. Changsha University of Science and Technology; 3. Fujian University of Technology; 4. Beijing University of Civil Engineering and Architecture展开收起
107
天
153
天
67
天
FAQ
Structural Control & Health Monitoring审稿要多久?
截至2026-11-18,CrushSCI 收录了 Structural Control & Health Monitoring 的 20 篇完整审稿记录。最快一篇从收稿到录用用了 43 天(A Self‐Attention‐Enhanced TCN‐BiGRU Framework for Missing Temperature Data Recovery in Construction‐Stage Bridge Monitoring,2026-06-21 收稿,2026-08-03 录用),最慢一篇用了 506 天;平均 215.2 天,中位数 191.5 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
