Paper Review Records
全部论文审稿周期
11 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
824
天
A Novel Droop Control Model for Optimizing Standalone DC Microgrid Operation Considering Load and Renewable Uncertainties
作者
S. Ida Evangeline; K. Baskaran; S. Darwin展开收起
作者单位
1. Department of Electrical and Electronics Engineering, Alagappa Chettiar Government College of Engineering and Technology; 2. Department of Electronics and Communication Engineering, Dr. Sivanthi Aditanar College of Engineering展开收起
202
天
Control and Protection of Medium Voltage Distribution Network Based on Unified Power Flow Controller
作者
Wenzhou Lu; Xiaolong Wu; Longxiang Duan; Zhiren Liu; Weilin Tong; Yongsheng Liu展开收起
作者单位
1. College of Internet of Things Engineering, Jiangnan University; 2. State Grid Jiangsu Electric Power Co., Ltd; 3. NR Electric Co., Ltd展开收起
328
天
169
天
Data-Driven SiC MOSFET Active Gate Driving for 380V/3A LVDC System Protection Employing Recurrent Deep Neural Network
作者
Pandia Rajan Jeyaraj; Brindhu Kumari Albert; Gnanavadivel Jothimani; Aravind Chellachi Kathiresan; Senthil Kumar Subramanium展开收起
作者单位
1. Department of Electrical and Electronics Engineering, Mepco Schlenk Engineering College; 2. School of Electrical Engineering, Vellore Institute of Technology; 3. Department of Electrical and Electronics Engineering, National Institute of Technology展开收起
180
天
185
天
FAQ
ELECTRIC POWER COMPONENTS AND SYSTEMS审稿要多久?
截至2026-11-19,CrushSCI 收录了 ELECTRIC POWER COMPONENTS AND SYSTEMS 的 11 篇完整审稿记录。最快一篇从收稿到录用用了 99 天(Machine Learning-Based Renewable Energy Systems Fault Mitigation and Economic Assessment,2023-12-17 收稿,2024-03-25 录用),最慢一篇用了 824 天;平均 269.5 天,中位数 202 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
