Paper Review Records
全部论文审稿周期
21 篇有效样本 · 按发表日期由新到旧排列
审稿天数=录用日期-收稿日期;保留 PDF/DOI/网页源链接
112
天
A Fully Coupled Hydro-Mechanical-Chemical Consolidation Model for Assessing Dewatering and Contaminant Removal Efficiency of Dredged Sludge
作者
Yutao Sun; Liuhui Jiang; Yunpeng Zhang; Peng Wang; Chuanxun Li展开收起
作者单位
Jiangsu University, Zhenjiang 212013, Jiangsu, PR China; Faculty of Engineering, China University of Geosciences, Wuhan 430074, Hubei, PR China展开收起
59
天
A hyperbolic-interface CDEM framework for modeling nonlinear crack closure in brittle rocks
作者
Yan Tao; Zhengzhao Liang; Chun Feng; Yingxian Lang; Wenqi Wang展开收起
作者单位
State Key Laboratory of Coastal and Offshore Engineering, Dalian University of Technology, Dalian, 116024, China; School of Infrastructure Engineering, Dalian University of Technology, Dalian, 116024, China; Key Laboratory for Mechanics in Fluid Solid Coupling Systems, Institute of Mechanics, Chinese Academy of Sciences, Beijing, 100190, China; School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo, 454003, China; China Construction Third Engineering Bureau Group Co.,Ltd., Wuhan, 430000, China展开收起
78
天
Lithology-specific morphological characterization and constraint-based spherical harmonic generation of Chang'e-6 Lunar Regolith particles
作者
Chuansheng Xu; Ao Luo; Yifei Cui; Zihan Zhang; Lu Jing展开收起
作者单位
State Key Laboratory of Hydroscience and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing, China; Key Laboratory of Hydrosphere Sciences of the Ministry of Water Resources, Tsinghua University, Beijing, China; Tsinghua Shenzhen International Graduate School, Tsinghua University, Shenzhen 518055, China展开收起
64
天
Deformation characteristics of energy piles under combined loads
作者
Lingfei Su; Chenglong Wang; Hanlong Liu; Abdelmalek Bouazza; Xuanming Ding; Gangqiang Kong展开收起
作者单位
School of Civil Engineering, Chongqing University, Chongqing 400045, China; State Key Laboratory of Safety and Resilience of Civil Engineering in Mountain Area, Chongqing 400045, China; Department of Civil and Environmental Engineering, Monash University, 23 College Walk, Clayton, Vic 3800, Australia; School of Future Technology, Hunan Institute of Engineering, Xiangtan 411104, China; School of Civil and Transportation Engineering, Hohai University, Nanjing 210024, China展开收起
78
天
Corotational FEM-DEM for Multiscale and Multiphase Modelling of Granular Soils
作者
Yushuo Zhang; Alejandro Cornejo; Pin Zhang展开收起
作者单位
Department of Civil and Environmental Engineering, National University of Singapore, Singapore 117576 Singapore; Department of Civil and Environmental Engineering (DECA), Universitat Politècnica de Catalunya (UPC), Campus Nord UPC, 08034 Barcelona, Spain; Centre Internacional de Mètodes Numèrics a l’Enginyeria (CIMNE), Campus Nord UPC, 08034 Barcelona, Spain展开收起
104
天
2D time-domain SH-wave full-waveform inversion for geotechnical site characterization: a practical comparison of optimization strategies
作者
Ye Li; Ruoyu Chen; Khiem T. Tran展开收起
作者单位
Department of Civil Engineering and Architecture, Jiangsu University of Science and Technology, Zhenjiang, Jiangsu 212100, China; Department of Civil & Coastal Engineering, University of Florida, Gainesville, FL 32611, USA展开收起
FAQ
COMPUTERS AND GEOTECHNICS审稿要多久?
截至2026-11-16,CrushSCI 收录了 COMPUTERS AND GEOTECHNICS 的 21 篇完整审稿记录。最快一篇从收稿到录用用了 39 天(Time-Dependent Load-Reduction Performance of High-Fill Box Culverts Equipped with Top and Side EPS layers,2026-05-31 收稿,2026-07-09 录用),最慢一篇用了 176 天;平均 82.5 天,中位数 78 天。
Expert Matching · Case Demo
把投稿要求,转成可验证的期刊方案
说清专业、时限和作者背景,CrushSCI 结合真实审稿样本,给出拟题方向、期刊初筛与周期判断。
